What is this licence?

This permit is required to move abnormal loads. It was introduced as a streamlined permit system. It lists designated routes administered by An Garda Síochána for the movement of loads on the major inter-urban routes and to Cork, Rosslare and Ringaskiddy Ports. These loads shouldn't exceed:

  • 27.4 metres in length
  • 4.3 metres in width

When do I need it?

It is only likely to be required for certain scales of infrastructure generating gases such as biogas or biomethane. To check if you need a licence, refer to the First Schedule to the EPA Act.

How to apply

Further details and an application form can be found on the An Garda Síochana website.

Fees

The fees for an Abnormal Loads Permit are:

  • Single Journey Permit - €60
  • Three Month Permit - €150
  • Annual Permit - €500

Issuing body

An Garda Síochana

Apply now (opens in a new tab)